Pacific C-PRO G1/4 PETG Tube 16mm OD Compression – Chrome (6-Pack Fittings) Pacific C-PRO G1/4 PETG Tube 16mm OD Compression – Chrome (6-Pack Fittings) Pacific C-PRO G1/4 PETG Tube 16mm OD Compression – Chrome (6-Pack Fittings) Pacific C-PRO G1/4 PETG Tube 16mm OD Compression – Chrome (6-Pack Fittings) Pacific C-PRO G1/4 PETG Tube 16mm OD Compression – Chrome (6-Pack Fittings) Pacific C-PRO G1/4 PETG Tube 16mm OD Compression – Chrome (6-Pack Fittings)
Pacific C-PRO G1/4 PETG Tube 16mm OD Compression – Chrome (6-Pack Fittings)

Pacific C-PRO G1/4 PETG Tube 16mm OD Compression – Chrome (6-Pack Fittings)

Out of stock
P/N
CL-W213-CU00SL-B
72,90 € (included VAT)
Thermaltake Pacific C-Pro PETG Fittings Installation Guide

Step 1. Slide the compression nut over the tube
Step 2. Install the o-ring
Step 3. Install the packing
Step 4. Install the fitting base on your components
Step 5. Tighten the compression nut

Caution: The O-ring and the packing with a groove on the inside diameter must always be installed towards the top of the compression nut.

Cautions

Thermaltake recommends the following steps to be taken before using the Pacific series radiators and water blocks:

  • To ensure a clean loop, flush and rinse your radiators and water blocks with distilled water prior to use.
  • Do not use tap water or distilled water as your coolant; it may harm your loop and reduce performance.
  • It is strongly recommended to use market-proven pre-mix coolant, such as Thermaltake Coolant 1000. It offers great performance while protecting the entire liquid loop from corrosion.
  • Before storing your water cooling components, please clean, rinse, and dry them to ensure a longer lifespan for your components.

Thermaltake recommends the following steps to be taken after completing your water loop setup:

  • It is strongly recommended to use market-proven pre-mix coolant, such as Thermaltake Coolant 1000. It offers great performance while preventing corrosion in the entire cooling system – copper, brass, nickel, aluminum, and steel.
  • Fill the reservoir with coolant and cycle the power on and off several times while the pump pushes the coolant into the loop.
  • DO NOT let the pump run dry; turn off the power immediately if there is no liquid entering the pump.
  • Fill the reservoir to the top to prevent air from entering the pump.
  • If necessary, tilt the system slightly from side to side to bleed air out of the loop.
  • Place some paper towels under fittings and joining points to check for leaks.
  • Run the loop with the fill port open for about 24 hours to completely bleed air out of the loop.
  • Before starting, flush your system correctly to prevent any coolant or unwanted particles from sticking to your tubes, radiators, and other cooling components.
  • Note that coolant might fade over time.
More Information
P/N CL-W213-CU00SL-B
MATÉRIEL CU
Model Pacific C-Pro G1/4 PETG 16mm OD 6 Pack - Chrome
Dimensions D26 x 21 (H) (mm)
Weight 320 g
Note PETG Tube to G1/4
Applicable OD : 16 mm
Screw Thread G 1/4

User Manual

  • File Name
  • La description
  • Size
  • Version
  • Release Date
  • Manual
  • Multi-language
  • 6.2 MB
  • 2018-01-10